Cgfd Series Aerated Bottle Gas Liquid Beverage Filling Machine

Cgfd Series Aerated Bottle Gas Liquid Beverage Filling Machine

Hello! My expensive pals!

I am Abby from CZPT CZPTCo., Ltd. 

It is my satisfaction to introduce our machine for you.

====================================================================================================

CGFD Sequence Aerated Bottle Gas Liquid Beverage Filling Device

Traits
one. Utilizing the wind sent obtain and move wheel in the bottle immediately linked technological innovation canceled screw and conveyor chains, this allow the adjust the bottle-formed turn into easier.
2. Bottles transmission adopt clip bottleneck technology, bottle-formed transform not need to adjust the tools degree, only modify related the curved plate, wheel and nylon areas is enough..
3. The specifically created stainless steel bottle washing device clip is reliable and sturdy, no contact with the screw area of bottle mouth to steer clear of secondary air pollution.
four. Substantial-speed huge gravity stream valve filling valve, filling rapidly, filling accurate and no liquid shed.
5. Spiraling decline when output bottle, remodel bottle condition no require to modify the top of conveyor chains.
6. Host adopt sophisticated PLC computerized handle technological innovation, the key electrical components from popular organization these kinds of as Japan’s Mitsubishi, France Schneider, OMRON.

Capabilities

Washer Station:
*All 304 stainless steel rinser heads, h2o spray type inject design and style, far more preserve h2o usage & far more thoroughly clean
*304 Stainless steel Gripper with plastic pad, ensure minimal bottle crash for the duration of washing
*304 stainless steel washing pumps.

Filler Station: 
*The filling station employing all metallic (not plastic) 304 stainless metal make contact with elements offers constant accurate, high precision filling nozzle together with vacuum pump regurgitant technique, to guarantee the large filling precision, make certain same filling degree.
*All 304 stainless metal get in touch with elements & liquid tank, fine polish, no dying corner, straightforward to clear

Capper station:
*Area & capping method, electromagnetic capping heads, with stress discharge purpose, make positive least bottle crash in the course of capping
*All 304stainless metal development
*No bottle no capping,
*Automated cease when deficiency of caps

CZPT Parameters

Product CGFD
eight-8-three
CGFD
twelve-12-six
CGFD
eighteen-eighteen-6
CGFD
24-24-eight
CGFD
32-32-10
CGFD
forty-forty-ten
Rinsing CZPT No 8 twelve eighteen 24 32 forty
Filling CZPT No 8 twelve 18 24 32 40
Capping CZPT No 3 six six 8 10 twelve/ten
RatedCapacity 1200-1500BPH 2500BPH 3500-4000BPH 7000-7500BPH 8000-10000BPH 10000-12000BPH
General Size 2000*1600*2300mm 2200*1600*2300mm 2450*1900*2300mm 2750*2180*2400mm 4000*2300*2300m 4550*2650*2300mm
Excess weight 2T 2.2T 3.0T 4.0T 8.0T 12.0T
Energy(KW) 3KW 3.5kw 4.0kw 4.8kw seven.6kw 8.3Kw
Rated Voltage 380V 380V 380V 380V 380V 380V

We also have other filling devices machines for your reference

Filling Liquid-(1)Water(2)Juice,Tea(three)Beer/Wine

     Suitable filling device as follows:

 

Famous: we also have other kind filling equipment,this sort of as glass bottle filling device ,cup filling machine,bag filling machine,oil filling machine, 5 gallon filling machine and so on

 

CZPT service

======================================================================================

*The sample service 
one.We can send out you the video of the managing equipment.
2.You are welcome to occur to go to our business,and see the device operating in our manufacturing unit,we can pick you up from the station around our town.
three.If we get the permission of the buyer who has brought the machines from us ,we can explain to you their speak to imformation,you can go to vist their manufacturing facility.
======================================================================================
*CZPTized service 
one.We can design and style the equipment according your requirements(materil,power,filling type,the sorts of the bottles,and so on),at the exact same time we will give you our specialist suggestion,as you know,we have been in this sector for numerous a long time.
two. We can provide some professional suggestion when you start this project, these kinds of as draw the manufacturing facility format for you,evaluate the source h2o report.
======================================================================================
*Following-sales services
1.We will give the bill of load on time to make positive you can get the machine quickly.
two.When you finish the Preparation circumstances ,our engineer will go to your factory to set up the equipment ,and give you the working manual ,and train your staff till they can function the machine properly.
three.We inquire opinions from our client and offer you assist when the creation line have been utilized for some time! 
four.We offer 12 months warranty with spare parts cost-free.

RFQ

one) Q:What payment methods your company accept?
A:We accept most of the payment methods, but mainly accept T/T,L/C,Western Union,Paypal and Money Gram.
 
two) Q:How long is the warranty time for your products?
A:Our officially promised warranty time is one whole year after delivery at best. And, we will support spare parts for free during this year.
 
3) Q:I haven’t done business with you guys before,how can i trust your company?
A:Our company has been in Alibaba.com for 6,almost 7 years,which is longer than most of our fellow suppliers,we’ve been golden suppliers for years.what’s more,we’ve got quite a lot authority certificates,for example,CE, CZPT, BV, Alibaba onsite check certificate. I hope those above will be persuasive enough.Our Trade Assurance Limit is US $66,000, and it is still going up.
 
four) Q:what’s the shipment terms and delivery time of your company?
A:Properly, they depends on the quantity of your order.As you know ,we need time to manufacture the machines.We will deliver the machines on time as the date we agreed both side. It usually takes 30 days after down payment received. As for detailed cost, it depends on your final order.
 
five) Q:Do you give any discount ?
A:I’ll surely try my best to help you get those by the best price and good service at the same time.
 
6) Q:How can I install my machine when it arrives?
A:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.

Why Pick Us?
 

Fast delivery time  30 days  after receiving the payment and sample bottles in advance
Long time guarantee 1 years guarantee
Control cabinet voltage 220V/380V 50Hz or by order
Solid packing Wooden case packing
Instruction with multi-languages Instructions in English, Russian or French
High quality main parts Stainless steels 304 and imported electric components
CZPT to door service CZPT personal for installation and training on site and free translator on site
Authentic certification CE, SGS, ISO
Online professional reply Responding in 24 hours to the customers’ questions
Big range for filling Filling machines from 2,000-22,000 bottles per hour
Low energy cost Ecologic design with low cost of energy
High flexibility The filling machines can be designed according to the customer’s special requirement
Free Services Bottle Designing
Label Desigining
Professional CZPT Supportance
Layout Designing
and so forth..

 

Cgfd Series Aerated Bottle Gas Liquid Beverage Filling Machine